Makena Building Group

Jongi Eastern Cape

Jongi, Eastern Cape

2024 New residential build
Location Jongi, Eastern Cape
Year 2024
Type New residential build
Floor area 320 m²
Duration 9 months
Compliance SANS 10400 (all applicable parts)
01 / The Brief

What we were asked to do

The client approached Makena with a site-and-plan project for a family home in the Eastern Cape. They needed a build that honoured the architectural intent down to the last detail — every fenestration line, every transition between materials, every sight-line from inside to out. The drawings had already been through plan examination; the brief was to build them as drawn, not as reinterpreted on site.

02 / Our Approach

Designed for compliance. Built by the same hand.

Because the same hand drew the plan and executed the build, there was no chain of reinterpretation to lose intent across. The architect was on site at every pour, every window-set, every detail call. SANS 10400 (all applicable parts) compliance was designed in from the first sketch — not bolted on after the inspector's first visit. The result: a build that matched the plan, and a plan that passed first time.

03 / Outcome

What we delivered

Delivered in 9 months. 320 m² of finished space, fully compliant with SANS 10400 (all applicable parts). The client moved into a home that matched the plan, the budget, and the brief — with the full fenestration schedule, material specifications, and as-built compliance certificate in the keys-and-pack.

Planning a similar residential build?

Get a fixed-fee quote from a complete plan — designed for compliance, drawn by an architect, built by the same hand. No reinterpretation between drawing and site.